Installation of Upgraded Bollards at Terminal 8 West
Client : Asia Container Terminals Ltd.
Period : 2014-2015
Installation of Upgraded Bollards at Terminal 8 West
Client : Asia Container Terminals Ltd.
Period : 2014-2015
The Works included the following: