Installation of Upgrade Bollards at Container Terminal 8

Installation of Upgraded Bollards at Terminal 8 West

Client : Asia Container Terminals Ltd.

Period : 2014-2015

The Works included the following:

  • to supply and install 25 nos. of 100 and 150 tons “Richards Marine” SG Iron marine bollards (CVCV100B and CVCV150) at Berth 13 and Berth 14 in ACT Terminal 8 (West), including the removal of the existing 25 nos. of 50 tons marine bollards; and
  • to carry out all other necessary reinstatement works for the completion of the bollard upgrading works.