Sheung Wan Stormwater Pumping Station - Main Structure, E&M and Landscaping Works
Client : DSD
Period : 2007-2009
Sheung Wan Stormwater Pumping Station - Main Structure, E&M and Landscaping Works
Client : DSD
Period : 2007-2009
Concentric was engaged as an exclusive sub-contractor to construct the main structure of Underground Storage Tank and Pump House including landscaping works in the open space, as well as supervision of the E&M specialist to design / supply / install / commission the pumping equipment and electrical works.
The project was completed 6 months ahead of schedule and alleviated the flooding problem in the low-lying areas in Sheung Wan. The successful delivery was attributed to the project team's ability to deliver seamless planning and construction solutions for both surface and underground activities among different trade disciplines.