Slope Stabilization Works for Hong Kong Institute of Vocational Education (Kwun Tong) at Hiu Ming Street, Kwun Tong, Klowloon - K.T.I.L. 709
Client : The Hong Kong Institute of Vocational Education
Period : 2015-2018
Slope Stabilization Works for Hong Kong Institute of Vocational Education (Kwun Tong) at Hiu Ming Street, Kwun Tong, Klowloon - K.T.I.L. 709
Client : The Hong Kong Institute of Vocational Education
Period : 2015-2018
Concentric was commissioned by HKIVE to carry out slope stabilization works at Kwun Tong IVE. Key deliverables included the construction of :