WSD contract No. 13/WSD/16

Mainlaying in Tseung Kwan O (NEC ECC Option C)

Client : Water Supplies Department

Period : 2017-2021 (in progress)

Laying about 10 km of DN1200 fresh water main, connecting the proposed desalination plant at TKO to the existing TKO fresh water primary service reservoir.

  • 8.3 km water main using Open Trench Method along carriageway and footpath
  • 1.6 km water main using Trenchless Method