Development of Lok Ma Chau Loop: Main Works Package 1 – Special Site Investigation Works (In-situ Trial of Sediment Treatment Works in Shenzhen River) and Laboratory Testing
Client : Civil Engineering and Development Department
Period : 2019-2021
Development of Lok Ma Chau Loop: Main Works Package 1 – Special Site Investigation Works (In-situ Trial of Sediment Treatment Works in Shenzhen River) and Laboratory Testing
Client : Civil Engineering and Development Department
Period : 2019-2021
The works include riverbed survey within the HKSAR boundary of Shenzhen River, in-situ trials of bioremediation treatment for sediments in Shenzhen River and associated laboratory testing.