Projects

Projects

Environmental

CEDD Contract YL/2018/03

Development of Lok Ma Chau Loop: Main Works Package 1 – Special Site Investigation Works (In-situ Trial of Sediment Treatment Works in Shenzhen River) and Laboratory Testing

Client

Civil Engineering and Development Department

2019-2021 

WhatsApp Image 2020-02-18 at 08.53.38
WhatsApp Image 2020-02-18 at 09.06.47
WhatsApp Image 2020-02-17 at 16.48.48(2)
WhatsApp Image 2020-02-05 at 14.37.34
191112-SZRIT-0007 (River bed survey)
191021_DSC01360
191121-SZRIT-0001 (Barge Fabrication)
191121-SZRIT-0009 (Barge Fabrication)

The works include riverbed survey within the HKSAR boundary of Shenzhen River, in-situ trials of bioremediation treatment for sediments in Shenzhen River and associated laboratory testing.