Waterworks

WSD Contract No. 13/WSD/16

Mainlaying in Tseung Kwan O (NEC ECC Option C)

Client

Water Supplies Department

2017-2021 (in progress)

190927-2063_TKO137
190911 ChC11+16~10+20 Placing large rock to trench (6) (TKO137)
190910 ChC11+16~10+20 Placing 10mm granular material in trench (2) (TKO137)
190912-Mobilisation of DN1200 MS pipe to the excated trench  (5) (TKO137)
190912 enclosing the end of DN1200 MS pipe (TKO137)
190601_CHA12+41.5 to CHA12+35  Backfilling Subbase (15)
190710_ChA12+29 Taper End shaft (1)
190706_ChA12+32~12+28 Casting Taper thrustblock (28)
190704_ChA12+31~12+23 Discharge tank condition (2)
190704_Water sapling for discharged water (1)
190926 IMG_4838 Tree Transplant
190926 IMG_20190925_115220 Tree Transplant
181004_115922 Opening Ceremony
180425_7516817456_IMG_0419
180920 IMG_0477
190402 DSC_7734 Wan Po Road

Laying about 10 km of DN1200 fresh water main, connecting the proposed desalination plant at TKO to the existing TKO fresh water primary service reservoir.

  • 8.3 km water main using Open Trench Method along carriageway and footpath.
  • 1.6 km water main using Trenchless Method.